Re: [boost] VC 7.1/8.0 regression testing, call for volunteers (Was: [1.33.0] Status as of July 14)

Carl Daniel wrote:
Aleksey Gurtovoy wrote:
Victor A. Wagner Jr. writes:
my system will be going offline until around 2005 August 1 in less than 24 hours as I've reported previously (we're moving)
Thanks for the heads up.
Is somebody else able/willing to pick up regular VC 7.1/8.0 regression testing?
I now have access to weekly builds of VC8 (currently testing the 7/11/2005 build!). At the moment, it's not feasible to do boost regression testing on those builds (it's a machine at MSFT), but I could look into getting it set up.
I now (once again) have the infrastructure in place locally to do boost regression testing on VC8 beta 2, and/or VC8 June CTP. Unless someone else volunteers, I can try to get my regression testing up and running again on either or both of these builds.
Is that a "willing to run vc8 tests but not vc71" ? For those volunteering it would be good to mention what resources you have available; CPU, memory, disk space, and machine time. As it takes a considerable amount of resources for testing, especially disk space. And having the faster machine and large ram will speed up the testing. I'm not trying to discourage people from volunteering though :-) Just want to make sure we keep up a reasonable testing pace. -- -- Grafik - Don't Assume Anything -- Redshift Software, Inc. - http://redshift-software.com -- rrivera/acm.org - grafik/redshift-software.com -- 102708583/icq - grafikrobot/aim - Grafik/jabber.org
participants (1)
-
Rene Rivera