7 Aug
2009
7 Aug
'09
2:18 p.m.
But even if we put aside the design/technical aspects and concentrate on the semantic ones: why should the error indicate cancellation if we were too late to cancel the operation and it actually managed to succeed?
Heh, from user's(or mine) point of view it hasn't succeed in time :)
From user's point of view - op succeeds only when handler was called. mm, I see holes in my logic, it's too.. "high-level"